DTE Energy Warren Service Center Building “C”
4 Nov 2013 | No Comments | posted by ajennings | in epoxy floor, existing construction

Project: Epoxy
Preparation of Epoxy:
1. Removed existing epoxy and paint
2. Cleaned, vacuumed and blew down the profiled surface.
Installation of Epoxy:
1. Applied Primer and Epoxy
2. Applied glass beads to create a non-skid surface